Further drawdowns (up to 6)
Each further drawdown uses the same repayment dates and ends on the same date as the original drawdown.
Sum of interest (all drawdowns):
Original Principal:
• Periods:
• Method: Monthly compounding + movement adjustments
• Region:
• Drawdowns (including original):
Combined schedule (sum of all drawdowns)
Per‑drawdown totals (with grand total)